Companies supplying international buyers may be asked to undergo a SMETA audit. In Oman, credible preparation means more than drafting a code of conduct: payroll, working-time, recruitment and safety records must demonstrate what actually happens on site. This practical guide explains the checks that commonly matter and how to review them before an audit.
How SMETA and Omani law work together
The audit’s distinctive challenge is evidence consistency: the employee contract, roster, payroll, WPS bank record and worker interview should describe the same employment experience. A practical starting point is to test whether these sources of evidence agree for each sampled worker.
SMETA (Sedex Members Ethical Trade Audit) is an audit methodology, not an ISO standard or a certification scheme. The assessment considers the applicable legal requirements, the ETI Base Code and other relevant code requirements. An independent audit produces findings and corrective actions; it does not create a universal “SMETA certificate” or a simple pass/fail label. The buyer determines how it uses the audit report.
SMETA commonly covers labour standards and health and safety as two core pillars; a four-pillar scope adds fuller environmental and business-ethics assessment. Confirm the requirements in your buyer instructions and current Sedex guidance before selecting the audit scope.
Oman labour-law checks auditors may examine
Working hours, breaks and weekly rest
Article 70 of the Oman Labour Law (Royal Decree 53/2023) generally limits actual working time to eight hours per day and 40 hours per week, with a daily rest/meal break of one hour excluded from working hours and a limit of six continuous working hours. Special Ramadan provisions apply to Muslim workers, and legally specified exceptions may apply to certain activities. Article 77 provides for at least two consecutive days of paid weekly rest, subject to applicable arrangements.
Auditors may compare shift rosters, attendance logs, site-gate records, payroll and worker interviews. Check that these sources tell the same story, including for subcontracted or temporary workers where applicable.
Overtime calculations and consent
Under Article 71, overtime is subject to statutory limits and conditions, including worker consent and applicable additional pay or compensatory time. The law addresses day and night premiums as well as work on weekly rest days and public holidays. Review your overtime approvals, wage calculations and the way supervisors request additional work; do not rely on a payroll total without the underlying hours.
Wages and the Wage Protection System
Ministerial Decision 729/2024 regulates the Wage Protection System (WPS). In general, wages must be transferred through the regulated system within three days of the end of the period for which they are due, and contracts must be updated when remuneration changes. Applicability and any exemptions should be checked against the current decision and Ministry of Labour guidance.
For each sampled employee, reconcile the employment contract, payroll calculations, payslip, approved deductions and bank/WPS payment confirmation. A pay statement alone is not evidence that wages reached the worker on time.
Recruitment, dignity and worker voice
An audit can also examine contracts, age and identity checks, recruitment fees, freedom of movement, grievance arrangements, fair treatment, disciplinary practices and non-discrimination. A written policy is useful, but worker interviews and case records are usually more persuasive evidence that it is being applied.
Health, safety and environment: check the actual scope
For health and safety, review site risk assessments, induction, emergency drills, machinery safeguards, PPE arrangements, incident records and contractor supervision. A four-pillar audit adds a more detailed environmental review, including permits and applicable conditions. Do not assume that every site has the same permit or monitoring obligations.
Oman’s Environmental Permits Regulation was issued under Environment Authority Decision 107/2023 and later amended. Decision 41/2026, effective 9 March 2026, repealed item 5 of Article 12 of that regulation. The amendment should be acknowledged in the legal register, but it does not itself establish that every permit holder must prepare an identical environmental register or monitoring report. Check the conditions of your specific permit and the currently consolidated rules.
A practical pre-audit records check
Use a single employee-and-period sample so that differences can be diagnosed rather than hidden. For example, if a roster lists a 10-hour shift but the wage record shows no overtime, investigate the approved schedule, breaks, consent and the actual gate or attendance evidence before deciding whether it is a payroll error or a working-time breach.
- Select a sample of workers from different shifts, job categories and employment arrangements.
- Reconcile one representative pay period across attendance, overtime approval, payroll, WPS evidence and worker agreements.
- Confirm weekly rest, break arrangements, overtime consent and any legally permitted exceptions.
- Check hiring files, grievance records and completed corrective actions against actual practice.
- Check whether your buyer requested two or four pillars, and review safety and environmental records accordingly.
- Assign each discrepancy an owner, deadline and evidence of closure. Re-test rather than simply filing a corrective-action form.
Common preparation mistakes
Do not substitute a generic policy pack for source evidence. Record the specific contradiction, explain its cause, correct the affected transaction where lawful, and retain an independently checkable closure record. Audit readiness is not a claim that the site will receive a particular finding or buyer approval.
A frequent problem is inconsistent evidence: rosters show one shift, access records show another and payroll records a third. Other weaknesses include outdated contract wages, undocumented overtime consent, worker interviews that contradict written policies, and environmental permits reviewed without their site-specific conditions. Correct the operating practice before changing the template.
Independent SMETA audit versus readiness support
A SMETA report is produced by a Sedex-approved auditor company; it is not a certificate and there is no universal pass/fail designation. A consultant can assist a site in understanding evidence gaps and tracking corrective actions, without replacing the independent auditor. For service details, see Qdot’s separate SEDEX consultancy page.
What a useful corrective-action record shows
For each exception, record the sampled worker or process, evidence compared, legal or code requirement, root cause, correction, preventive action, accountable owner, due date and verification result. The purpose is to demonstrate a sustained correction, not simply to close a spreadsheet row.
Preparing for a SMETA Audit in Oman?
Tell Qdot about your site, workforce size and what your buyer has asked for.
FAQs
No. SMETA is an audit methodology. Buyers review the resulting report and any corrective-action progress.
No. The audit scope depends on the buyer’s requirement and the agreed assessment.
No. The actual permit conditions and current rules govern the documents and reporting needed for that activity.